DOUBLE T GUIDEWAYS TO CUT TRANSIT COSTS

A brief outline of testing procedures and results of an 80 ft (24 m), 93-ton (84 Mg) double T girder to be incorporated in the Dade County rapid transit system. Also discussed is a brief description of this rapid transit system which will serve the Miami, Florida area and estimated cost savings. (Authors)

  • Availability:
  • Corporate Authors:

    American Concrete Institute

    P.O. Box 19150, Redford Station, 22400 Seven Mile Road
    Detroit, MI  United States  48219
  • Authors:
    • Bhatia, M K
    • Rabbat, B G
    • Russell, H G
  • Publication Date: 1980-7

Media Info

  • Features: Figures; References;
  • Pagination: p. 60-62
  • Serial:
    • Concrete International
    • Volume: 2
    • Issue Number: 7
    • Publisher: American Concrete Institute (ACI)
    • ISSN: 0162-4075

Subject/Index Terms

Filing Info

  • Accession Number: 00319173
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Jan 19 1982 12:00AM