Catch Basin Inserts for Ohio Roadways

Detailed evaluation of roadside catch basin inserts (CBIs) for the removal of total suspended solids (TSS). Study consisted of both field and laboratory testing. Field testing evaluated the installation, maintenance and removal needs for CBIs during a year-long installation period. The Lab testing evaluated the sediment retention associated with each CBI. Since none of the units met both the sediment removal and installation requirements, and due to the high effort and cost to maintain, the CBIs tested do not appear to be a viable option to be added as post-construction stormwater best management practices (BMPs) for Ohio Department of Transportation (ODOT).

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Appendices; Figures; Maps; Photos; Tables;
  • Pagination: 303p

Subject/Index Terms

Filing Info

  • Accession Number: 01685227
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/OH-2018-16, GS&P Project No. 42299.00
  • Contract Numbers: SJN 135444; PID 103684
  • Files: TRIS, ATRI, USDOT, STATEDOT
  • Created Date: Oct 30 2018 9:53AM