BRIDGE BUILDING WHILE MAINTAINING RAILWAY OPERATION

BRUECKENBAU IM EISENBAHNBETRIEB

When constructing, re-building or renovating railway bridges, the work must be planned and carried out so as to allow as far as possible for continuing traffic operation, in order to reduce restrictions and obstacles to a minimum. Safety must be the first consideration when selecting the design and method of construction. A necessary requirement for success is optimum cooperation of all the departments involved. The economic aspect must also be borne in mind.

  • Corporate Authors:

    Austrian Federal Railways

    Elisabethstrasse 9
    1010 Vienna,   Austria 
  • Authors:
    • Fischbach, A
  • Publication Date: 1980-1

Language

  • German

Media Info

  • Features: Photos;
  • Pagination: p. 4-11
  • Serial:
    • OBB-Journal
    • Issue Number: 1
    • Publisher: Austrian Federal Railways

Subject/Index Terms

Filing Info

  • Accession Number: 00316544
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Sep 16 1980 12:00AM