WHAT ARE THE COSTS OF LOW NOISE-LEVEL CONSTRUCTION FOR METROS?

WAS KOSTEN LAERMARME BAUWEISE BEIM U-BAHN-BAU?

Four diagrams are used to define the relation between construction costs and noise evaluation as resulting from a test line, with special reference to achieving values of 65, 70, 75 and 80 dB(A). The "cover-type construction" has particular advantages. A survey of 15 different types of metro construction is given.

  • Corporate Authors:

    Springer Verlag

    Heidelberger Platz 3
    1000 Berlin 33,   Germany 
  • Authors:
    • Paersch, A
    • Seeling, R
  • Publication Date: 1979

Language

  • German

Media Info

  • Features: Photos; References; Tables;
  • Pagination: p. 415-418
  • Serial:
    • Bauingenieur
    • Volume: 54
    • Issue Number: 11
    • Publisher: Springer Verlag

Subject/Index Terms

Filing Info

  • Accession Number: 00312046
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Jul 22 1981 12:00AM