NON-CONVENTIONAL TRACK. REPORT ON THE EXPERIMENTAL SLAB TRACK IN OELDE STATION. CONSTRUCTIONAL ARRANGEMENTS AND MEASUREMENTS

This report describes installation of slab track at Oelde where there is opportunity of high speed running, and experience since the end of 1972. Two types of rail fasteners were used and the slab was laid on a styropor concrete bed providing thermal insulation and load distribution. Details of design are described and measurements reported showing strains and geometrical condition of the track.

  • Supplemental Notes:
    • Restrictions on the use of this document are contained in the explanatory material.
  • Corporate Authors:

    International Union of Railways

    Office of Research and Experiments
    Utrecht,   Netherlands 
  • Publication Date: 1975-10

Media Info

  • Features: Figures; Tables;
  • Pagination: 29 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00053176
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Report/Paper Numbers: D 87/RP 13/E
  • Files: TRIS
  • Created Date: Sep 16 1976 12:00AM