STANDARDISATION OF AIR-CONDITIONING AND HEATING INSTALLATIONS. EVALUATION OF THE TESTS MADE IN THE VIENNA ARSENAL CLIMATIC CHAMBERS WITH SEVERAL PASSENGER COACH AIR-CONDITIONING SYSTEMS. (TEXT, APPENDICES, TABLES AND FIGURES)

The ORE B 108 Specialists Committees have investigated various air-conditioning and energy supply systems in coaches of virtually identical design. This report evaluates and compares the results of the tests on various air-conditioning systems. A separate report will deal with tests on energy supply systems. However, since air-conditioning plants and energy supply systems are closely linked, reference will sometimes be made, also in this report, to the energy supply part for easier understanding.

  • Supplemental Notes:
    • Restrictions on the use of this document are contained in the explanatory material.
  • Corporate Authors:

    International Union of Railways

    Office of Research and Experiments
    Utrecht,   Netherlands 
  • Publication Date: 1975-10

Media Info

  • Features: Appendices; Figures; Tables;
  • Pagination: 21 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00053172
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Report/Paper Numbers: B107/RP 4/E
  • Files: TRIS
  • Created Date: Aug 3 1976 12:00AM