Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 6: Prototype Acceptance Test Summary Report

The Task 6 Prototype Acceptance Test Summary Report summarizes the results of Acceptance Testing carried out at Battelle facilities in accordance with the Task 6 Acceptance Test Plan. The Acceptance Tests were designed to verify that the prototype system operates in accordance with the system requirements documented in the Prototype System Requirements Specifications. The purpose of this testing was to assess prototype readiness for the subsequent Prototype Proof-of-Concept Test conducted at Turner-Fairbank Highway Research Center (TFHRC). This report does not include detailed analysis and findings which are the subject of the separate Field Test Evaluation Report.

  • Record URL:
  • Corporate Authors:

    Battelle

    505 King Avenue
    Columbus, OH  United States  43201-2693

    Department of Transportation

    Intelligent Transportation Systems Joint Program Office
    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Authors:
    • Valentine, David
    • Guspan, Kristina
    • Hailemariam, Margaret
    • Boyapati, Rama Krishna
    • Paselsky, Ben
    • Baumgardner, Greg
  • Publication Date: 2017-10-30

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Appendices; Figures; Tables;
  • Pagination: 66p

Subject/Index Terms

Filing Info

  • Accession Number: 01671749
  • Record Type: Publication
  • Report/Paper Numbers: FHWA-JPO-17-507
  • Contract Numbers: DTFH61-12-D-00046 / 5015
  • Files: NTL, TRIS, ATRI, USDOT
  • Created Date: May 30 2018 9:45AM