DETERMINATION OF DYNAMIC FORCES IN BRIDGES. RAIL BEARERS AND CROSS-GIRDERS. TEXT AND APPENDICES

During the presentation of the Programme of Work at the 47th meeting of the ORE Control Committee held in Utrecht in October 1963, the D 23 Specialists Committee had envisaged preparing an Interim Report dealing with the study of rail bearers and cross girders. This work is described in this report. A detailed description of the bridges belonging to the a Sub 3 and a Sub 6 series used for the tests and also that of the test trains has been given in Interim Reports Nos. 3 and 5 of the D 23 Specialists Committee. This Interim Report does not give any formula for the dynamic increment as a function of the span, the speed or the stress due to the static live load. The results of the tests described in this report have subsequently been used as a basis for the part "Rail bearers and cross girders" in Interim Report No. 12: "Presentation of the results obtained from steel bridges".

  • Supplemental Notes:
    • Restrictions on the use of this document are contained in the explanatory material.
  • Corporate Authors:

    International Union of Railways

    Office of Research and Experiments
    Utrecht,   Netherlands 
  • Publication Date: 1966-5

Media Info

  • Features: Appendices;
  • Pagination: 15 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00052840
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Report/Paper Numbers: D23/RP 11/E Intrm. Rpt
  • Files: TRIS
  • Created Date: Jun 5 1976 12:00AM