ACT-1: URBAN RAPID RAIL VEHICLE AND SYSTEMS PROGRAM. ENGINEERING TEST OF ACT-1 VEHICLE AT TRANSPORTATION TEST CENTER

This document contains a description of the ACT vehicles as delivered to UMTA, including major changes incorporated during testing at the Transit Test Center (TTC), in Pueblo, Colorado, and the rationale for these changes. The test program is described in detail and results are presented for checkout, adjustment, engineering, and acceptance testing of the ACT vehicles. These vehicle tests include: (1) crash attenuation; (2) performance tests, i.e., acceleration, speed regulation, deceleration, power consumption, thermal duty cycle, slip/spin efficiency, ride quality data, and acoustics data. The instrumentation system description is included in the appendix. The test program results in confirmation of significant achievements in vehicle operating efficiency; technology advances in component design and integration; and of considerations for passenger safety, security, and comfort.

Media Info

  • Media Type: Digital/other
  • Pagination: 455 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00313251
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: D174-10054-1 Final Rpt., UMTA-IT-06-0026-79-6
  • Contract Numbers: DOT-UT-10007
  • Files: NTIS, TRIS, USDOT
  • Created Date: May 21 1981 12:00AM