PREDICTING SEISMIC VELOCITY DISTRIBUTION AHEAD OF TUNNEL FACE USING DRILL VIBRATION OF HYDRAULIC DRILLING MACHINE

油圧式削岩機の削孔振動を利用したトンネル切羽前方地山の速度分布予測

Accurate prediction of the geological conditions ahead of the tunnel face is essential for safe and economical tunnel construction. As an application of the drill logging, a new method for predicting the distribution of seismic velocity ahead of the tunnel face has been developed. The method makes it possible to determine the travel time from transmission to reception by determining the transmission time at which the rock is hit by the drill bit and processing the wave form of the vibration received by the receivers on the tunnel face. Field test results have shown that the newly developed method is useful in predicting the seismic wave velocity distribution ahead of the tunnel face. トンネル切羽前方地山の状態を的確に予測することは,安全で経済的な施工に必要不可欠である.ノンコアボーリングの調査である削孔検層法は,山岳トンネルの施工に用いられるドリルジャンボの油圧式削岩機を利用できること,削孔速度や削岩機の油圧データを用いて地山の硬軟の程度を定量的に評価できるなどの特徴がある.この削孔検層法の応用技術として,油圧式削岩機が地山を削孔する際の振動を切羽に設置した複数の受振器で計測し,弾性波トモグラフィ解析により地山等級区分の重要な指標である弾性波速度の分布を予測する調査法を開発した.現場実験により切羽前方地山の弾性波速度分布の予測に適用できることを確認した.

Language

  • English
  • Japanese

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01668985
  • Record Type: Publication
  • Source Agency: Japan Science and Technology Agency (JST)
  • Files: TRIS, JSTAGE
  • Created Date: Feb 24 2018 3:02PM