PROCEDURE AND CRITERIA FOR PROGRAMMING THE CONSTRUCTION OF ROADS IN THE SOCIALIST REPUBLIC OF MONTENEGRO FOR THE PERIOD 1976 TO 1980, WITH A LOOK AT THE ACCEPTED PROGRAMME

POSTUPAK I KRITERIJI DONOSENJA PROGRAMA IZGRADNJE PUTEVA U SR CRNOJ GORI ZA PERIOD 1976/1980

The article presents in a chronological order, methods for developing and accepting this programme which is so important for the development of the republic. Its basic characteristic is the wide socioeconomic interest and the particular importance of roads as one of the essential elements for the whole development. This resulted in making four versions of the programme, each version being subjected to public discussion, which lasted altogether a little less than two years. It is concluded that this method of working is a useful innovation and is the result of the new self-management arrangements which are being formed for road construction. The results of the programme by the end of 1980 are given, when 261 kilometres of new roads will have been constructed. /TRRL/

  • Corporate Authors:

    Savez Drustava Za Puteve Jugoslavije

    Kumudraska 257
    Belgrad,   Serbia 
  • Authors:
    • Radusinovic, B
  • Publication Date: 1978

Language

  • Serbian

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00302566
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Jan 30 1980 12:00AM