Following a report on the situation after the collapse of the Reichsbruecke Bridge on 1st August 1976, the emergency measures devised by the technical staff are described. The salvage of the bridge was undertaken in two stages. Stage 1 - the raising of the left bank end span, which made it possible to open a temporary shipping lane. Stage 2 - clearance of the 240 M wide central span. The pulling equipment is described in detail; this consisted mainly of vsl plant as well as the necessary hydraulic control gear and was installed on tensioning foundation blocks already erected. /TRRL/

  • Authors:
    • Seltenhammer, U
  • Publication Date: 1978

Language

  • German

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 50-54
  • Serial:
    • Zement und Beton
    • Volume: 23
    • Issue Number: 1
    • Publisher: Verein de Oesterreich Zementfab & Oester Beton

Subject/Index Terms

Filing Info

  • Accession Number: 00301043
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Files: ITRD, TRIS
  • Created Date: Nov 27 1979 12:00AM