BORED CAST-IN-SITU PILES. STATE OF THE ART

LES PIEUX FORES - RECUEIL DE REGLES DE L'ART

This publication gives general guidelines for construction and control adapted to different site conditions and structural characteristics for each operaiton of the installation of cast-in-situ piles: boring, sheathing, reinforcement and concreting. Valid regulations are recalled, and data are given on the drafting of contracts, evaluation of offers and technical proposals. The organization of control operations is defined for different construction stages, and guidelines are offered to work supervisors. This publication can also be used as an additional manual for personnel education. Attention is drawn to the administrative requirements as regards quality of the work. (TRRL)

  • Corporate Authors:

    Central Laboratory of Bridges & Highways, France

    75732 Paris,   France 

    Department of Technical Studies of Rds & Motrwy,Fr

    Avenue Aristide-Briand 46
    92220 Bagneux,   France 
  • Publication Date: 1978-12

Language

  • French

Media Info

  • Features: Figures; Photos; References; Tables;
  • Pagination: 195 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00302747
  • Record Type: Publication
  • Source Agency: Laboratoire Central des Ponts et Chausees (LCPC)
  • Report/Paper Numbers: Monograph
  • Files: ITRD, TRIS
  • Created Date: Jan 15 1980 12:00AM