Polymer Concrete Overlay Evaluation

The objectives of this work were to document the state-of-the-practice with respect to polymer concrete overlays, document the placement of two overlays in Iowa, monitor the field performance of the overlays over a two-year period, and relate their performance to material usage and/or workmanship. The two bridges—a Johnson County, Iowa bridge over I-80 on 12th Avenue in Coralville, and the Keg Creek Bridge on Hwy 6 in western Iowa, 10 miles east of Council Bluffs—were overlaid during the summer/fall of 2013. The process by which each bridge was overlaid was similar in many ways, although a few slight differences existed. Over time, each overlay has generally performed quite well with only a few areas of exception. It is believed that these localized areas likely underperformed due to poor deck preparation, improper polymer mixing, snowplow impact, or a combination thereof.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Appendices; Figures; Maps; Photos; References; Tables;
  • Pagination: 245p

Subject/Index Terms

Filing Info

  • Accession Number: 01605690
  • Record Type: Publication
  • Report/Paper Numbers: InTrans Project 13-463
  • Files: TRIS, ATRI, USDOT, STATEDOT
  • Created Date: Jul 11 2016 10:32AM