Split Decision

Engineers from the T.Y. Lin International Group chose a hybrid bridge design that combines the beauty of a cable-stayed design with the simplicity and strength of a girder bridge, in determining the types of bridges to design for crossings on both sides of the Yuzhong peninsula in Chongqing, China - times two. Details of the design and construction are presented in this article.

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01599587
  • Record Type: Publication
  • Files: TRIS, ASCE
  • Created Date: May 5 2016 12:24PM