Final Report: Dallas Integrated Corridor Management (ICM) Demonstration Project

The Dallas Area Rapid Transit (DART) led the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information on highways, arterials, transit, weather, and incidents. The ICM system utilizes the existing standards based communication infrastructure, and provides direct connections to agencies not on the Center-to-Center network via a web-based interface SmartNET. The ICM system uses SmartNET as the main graphical user interface for the ICM stakeholders to create, edit, and view events in the corridor and region, view current conditions of field devices and congestion on the roadway network, and coordinate responses to incidents within the corridor. This final project report includes an overview of the system engineering phases of the project, the results and lessons learned, and recommendations for others implementing ICM.

  • Record URL:
  • Corporate Authors:

    Dallas Area Rapid Transit

    1401 Pacific Avenue
    Dallas, TX  United States  75202

    Department of Transportation

    Intelligent Transportation Systems Joint Program Office
    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Authors:
    • Miller, Kevin
    • Bouattoura, Fariel
    • Macias, Roberto
    • Poe, Chris
    • Le, Minh
    • Plesko, Todd
  • Publication Date: 2015-8-13

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Figures; References; Tables;
  • Pagination: 44p

Subject/Index Terms

Filing Info

  • Accession Number: 01594238
  • Record Type: Publication
  • Report/Paper Numbers: FHWA-JPO-16-234
  • Contract Numbers: DTFH61-06-H-00040
  • Files: NTL, TRIS
  • Created Date: Mar 21 2016 4:47PM