FULLFACE BORING IN TUNNELS

FULLPROFILBORING AV TUNNELER

A detailed examination is given of tunnel face conditions, tunnel excavation, equipment costs, work behind the working face, costs, permanent support, use of the quarried material, preliminary investigations and current projects on fullface boring of tunnels. The costs are evaluated on a basis of the rock conditions, and are compared with conventional tunnelling. /TRRL/

  • Corporate Authors:

    Norges Tekniske Hogskole

    Institut for Anleggsdrift
    7034 Trondheim NTH,   Norway 
  • Publication Date: 1976

Language

  • Norwegian

Media Info

  • Features: Figures; Tables;
  • Pagination: 94 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00300120
  • Record Type: Publication
  • Source Agency: Norwegian Road Research Laboratory
  • Report/Paper Numbers: Prosjektrapport 1-76Monograph
  • Files: ITRD, TRIS
  • Created Date: Nov 7 1979 12:00AM