A DATA-BASED METHODOLOGY FOR SPECIFYING CONSTRUCTION PROJECT DURATIONS

This report presents a method of determining the construction contract performance times for Military Construction projects. This method is based on information that is regularly reported as feedback during the execution of a construction contract for Military Construction. Army projects. By organizing the data from the manpower- utilization feedback reports, a model is formulated and mathematically derived. An example of data reduction is presented, and the results of applying the methodology to these projects are reported. A proposal of implementation of the methodology in U.S. Army Corps of Engineers' district offices is presented.

  • Corporate Authors:

    Army Construction Engineering Research Laboratory

    P.O. Box 4005
    Champaign, IL  USA  61820
  • Authors:
    • Halpin, D W
    • Delong, C E
  • Publication Date: 1973-8

Media Info

  • Features: References;
  • Pagination: 21 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00261495
  • Record Type: Publication
  • Report/Paper Numbers: CERL-TR-P-14
  • Files: TRIS
  • Created Date: Oct 11 1974 12:00AM