Validation of the Maximum Allowable Amounts of Recycled Binder, RAP, and RAS Using Accelerated Pavement Testing—Interim Report

This report summarizes the work conducted on Project 0-6682 up to August 31, 2013. The report is organized in five chapters corresponding to separate tasks in the project work plan, as follows: Chapter 1 presents the summary of the findings from the literature review. Chapter 2 presents the plan for the accelerated pavement testing. Chapter 3 reports on the establishment of the accelerated pavement testing facility. Chapter 4 presents the results of the laboratory testing conducted to design the mixes. Chapter 5 presents the construction of the hot mix asphalt layers and provides results of the in-situ tests done during construction.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Technical Report
  • Features: Appendices; Figures; Photos; References; Tables;
  • Pagination: 78p

Subject/Index Terms

Filing Info

  • Accession Number: 01529352
  • Record Type: Publication
  • Report/Paper Numbers: FHWA/TX-14/0-6682-1, 0-6682-1
  • Contract Numbers: 0-6682
  • Files: TRIS, ATRI, USDOT, STATEDOT
  • Created Date: Jun 12 2014 11:10AM