The train platforming problem: The infrastructure management company perspective

If railway companies ask for station capacity numbers, their underlying question is in fact one about the platformability of extra trains. Train platformability depends not only on the infrastructure, buffer times, and the desired departure and arrival times of the trains, but also on route durations, which depend on train speeds and lengths, as well as on conflicts between routes at any given time. The authors consider all these factors in this paper. They assume a current train set and a future one, where the second is based on the expected traffic increase through the station considered. The platforming problem is about assigning a platform to each train, together with suitable in- and out-routes. Route choices lead to different route durations and imply different in-route-begin and out-route-end times. The authors' module platforms the maximum possible weighted sum of trains in the current and future train set. The resulting number of trains can be seen as the realistic capacity consumption of the schedule. The authors' goal function allows for current trains to be preferably allocated to their current platforms. The authors' module is able to deal with real stations and train sets in a few seconds and has been fully integrated by Infrabel, the Belgian Infrastructure Management Company, in their application called Ocapi, which is now used to platform existing and projected train sets and to determine the capacity consumption.

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01523116
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Apr 4 2014 12:36PM