CUT-AND-COVER AND BORED TUNNEL CONSTRUCTION ADOPTED BY LONDON TRANSPORT'S TUBE RAILWAY EXTENSION LONDON AIRPORT

Secant-piling and rubber-supported track decking techniques applied for the two-mile residential area combined with box construction and concrete-lined tunnels within the airport perimeter to suite surface conditions on the 3-1/2-mile extension of Piccadilly Line.

  • Availability:
  • Corporate Authors:

    Broadfields (Technical Publishers) Limited

    Little Leighs
    Chelmsford, Essex CMB 1PM,   England 
  • Publication Date: 1973-4

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00046818
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Oct 18 1981 12:00AM