Railway Timetable Rescheduling Based on the Feedback of Train-set Circulation
This paper deals with the timetable rescheduling problem based on the feedback of train-set's circulation in high speed railway transportation. Given the original timetable and the corresponding train-set circulation scheme, the authors describe an integer linear programming model based on the fixed departure/arrival order, which can tackle a static timetable rescheduling to optimize the train-set circulation, bring out more connections, especially without direction change in through station between train lines. Lingo11.0 is used in the case study.
- Record URL:
- Record URL:
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/18770428
-
Supplemental Notes:
- Abstract reprinted with permission from Elsevier
-
Authors:
- Xie, Meiquan
- Li, Xiamiao
-
Conference:
- 8th International Conference on Traffic and Transportation Studies (ICTTS 2012)
- Location: Changsha , China
- Date: 2012-8-1 to 2012-8-3
- Publication Date: 2012
Language
- English
Media Info
- Media Type: Digital/other
- Features: Figures; References; Tables;
- Pagination: pp 781-789
-
Serial:
- Procedia - Social and Behavioral Sciences
- Volume: 43
- Issue Number: 0
- Publisher: Elsevier
- ISSN: 1877-0428
- Serial URL: http://www.sciencedirect.com/science/journal/18770428/53
-
Publication flags:
Open Access (libre)
Subject/Index Terms
- TRT Terms: High speed rail; Integer programming; Linear programming; Optimization; Scheduling; Timetables
- Identifier Terms: LINGO (Programming language)
- Subject Areas: Planning and Forecasting; Railroads; I72: Traffic and Transport Planning;
Filing Info
- Accession Number: 01500556
- Record Type: Publication
- Files: TRIS
- Created Date: Nov 6 2013 11:35AM