The Performance of Transportation Projects Funded by Foreign Loan in Indonesia (2006-2010)
Many Indonesian transportation projects were funded by foreign loans, e.g. projects in Ministry of Transport and Ministry of Public Works. The data used were from Indonesian National Development Planning Agency quarterly reports (2006-2010). Descriptive statistics analysis was conducted to the progress variant for each directorate general. Some t-tests were done to obtain whether in the observation period the mean progress variant for each directorate general was indicating serious delay. Serious delay projects characteristics were mapped. The percentage of serious delay worsened between 2006-2009. Overall serious delay rate was 39%. In general, serious delay occurance started when elapsed time reach 30-40%.
- Record URL:
- Record URL:
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/18770428
-
Supplemental Notes:
- Abstract reprinted with permission from Elsevier.
-
Authors:
- Putranto, Leksmono S
- Karyana, Yudi
- Damantoro, Tory
- Wicaksono, Madyaswanto
-
Conference:
- 8th International Conference on Traffic and Transportation Studies (ICTTS 2012)
- Location: Changsha , China
- Date: 2012-8-1 to 2012-8-3
- Publication Date: 2012
Language
- English
Media Info
- Media Type: Digital/other
- Features: Figures; References; Tables;
- Pagination: pp 65-72
-
Serial:
- Procedia - Social and Behavioral Sciences
- Volume: 43
- Issue Number: 0
- Publisher: Elsevier
- ISSN: 1877-0428
- Serial URL: http://www.sciencedirect.com/science/journal/18770428/53
-
Publication flags:
Open Access (libre)
Subject/Index Terms
- TRT Terms: Foreign; Investments; Loans
- Uncontrolled Terms: Project delays; Transportation projects
- Geographic Terms: Indonesia
- Subject Areas: Finance; Transportation (General); I10: Economics and Administration; I70: Traffic and Transport;
Filing Info
- Accession Number: 01497836
- Record Type: Publication
- Files: TRIS
- Created Date: Nov 6 2013 11:34AM