DEEP-PLOW LIME STABILIZATION FOR PAVEMENT CONSTRUCTION

DEEP-PLOW LIME STABILIZATION EQUIPMENT AND PROCEDURES FOR TREATING SUBSTANTIAL THICKNESSES OF IN SITU SUBGRADE SOIL ARE DESCRIBED. FIELD STUDY DATA AND RESULTS ARE SUMMARIZED, AND POTENTIAL FIELD APPLICATIONS ARE CONSIDERED. IT IS CONCLUDED THAT DEEP- PLOW LIME STABILIZATION PROCEDURES CAN BE SUCCESSFULLY UTILIZED IN PAVEMENT CONSTRUCTION IF APPROPRIATE CONSIDERATION IS GIVEN TO STABILIZATION OBJECTIVES AND QUALITY CONTROL REQUIREMENTS. /AUTHOR/

  • Availability:
  • Supplemental Notes:
    • VOL 98 NO TE2 PP 311-23
  • Authors:
    • Thompson, M R
  • Publication Date: 1972-5

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00233318
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Dec 13 1972 12:00AM