CONSOLIDATION OF A SIDE SLOPE BY MEANS OF DEEP ANCHORAGES

THIS ARTICLE DESCRIBES AND ILLUSTRATES THE CONSOLIDATION OF UNSTABLE SEDIMENTARY SOILS AND THE CONSTRUCTION OF A RETAINING WALL AGAINST A LANDSLIP SLOPE. DETAILS ARE GIVEN OF THE METHOD AND EQUIPMEENT USED FOR THE INSTALLATION OF THE 13-TON ANCHORAGES HOLDING THE RETAINING WALL. THE WORK DESCRIBED WAS CARRIED OUT AT PELOTTA, ON THE BORDIGHERA-SAN REMO SECTION OF THE PONTE S, LUIGI - SAVONA MOTORWAY. /TRRL/

  • Authors:
    • Mongilardi, H
  • Publication Date: 1972-12

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 669-78
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00237153
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: TRIS
  • Created Date: Nov 14 1973 12:00AM