Study of the Relationship between Procurement Duration and Project Performance in Design-Build Projects: Comparison between Water/Wastewater and Transportation Sectors

Previous studies on building, industrial, and transportation projects found that projects delivered using design-build tend to perform better than projects delivered with the traditional design-bid-build method. However, performance of design-build projects is affected by various factors, with procurement-related factors being among the most influential. Whereas other aspects of procurement have been largely investigated, the effect of procurement duration on project performance has been studied only for design-build transportation projects. In addition, few studies have focused specifically on the delivery of water/wastewater projects. This paper includes the results of a study on the relationship between procurement duration and performance of water/wastewater design-build projects. The study methodology was based on regression analysis of data from a sample of water/wastewater design-build projects. The results show that unlike the transportation sector, procurement duration has little effect on either schedule or cost performance in the water/wastewater sector. Likely reasons for this difference were then explored through a content analysis of procurement documents.

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01493963
  • Record Type: Publication
  • Files: TRIS, ASCE
  • Created Date: Sep 17 2013 3:56PM