SOUTHERN INJECTS LIME SLURRY TO STABILIZE SOFT TRACK

On/off-track outfit permits high-speed treatment of soft track to stiffen clay subsoil, resulting in better track support. Injector pipes are driven hydraulically into the ground to a depth of 6 ft. The slurry is forced into the wet strata.

  • Availability:
  • Corporate Authors:

    Simmons-Boardman Publishing Corporation

    P.O. Box 350
    Bristol, CT  United States  06010
  • Publication Date: 1972-9

Media Info

  • Pagination: p. 36-37
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00046439
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Sep 18 1974 12:00AM