XIIITH CONGRESS TOKYO 1967. QUESTION II: PLANNING OF PROJECTS - EARTHWORKS

THE FOLLOWING TOPICS WERE DISCUSSED: (1) PRELIMINARY SURVEYS FOR THE STUDY OF PROJECTS, (2) GEOMETRIC STUDIES FOR THE PROJECTS - COMPUTER PROCESSES - PLAN SURVEY - ALIGNMENT, VOLUME OF EXCAVATION,SETTING OUT,(3)SOIL SAMPLING (4) EARTHWORKS IN CONTACT WITH THE PAVEMENT, (5) CONSTRUCTION OF EARTHWORKS, AND (6) SPECIAL CASES (ROADS ON SUBSOILS OF LOW BEARING CAPACITY, ROADS ON SOILS LIABLE TO LANDSLIP, SUBSIDENCE AND SUBJECT TO BE COVERED WITH SAND, AND ROADS ON SALTY SOILS). A GENERAL REPORT BY THIEBAULT, A., IS APPENDED. /RRL/

  • Supplemental Notes:
    • pp 522-32, FIGS, TABS, PHOTS, REFS
  • Corporate Authors:

    Perm Intl Assoc Road Congress

    ,    
  • Authors:
    • THIEBAULT, A
  • Publication Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 00234882
  • Record Type: Publication
  • Source Agency: Road Research Laboratory /UK
  • Files: TRIS
  • Created Date: Nov 23 1970 12:00AM