CAST-IN-SITU WALL TECHNIQUE USED DURING ROAD CONSTRUCTION WORKS IN PARIS /IN FRENCH/

THE APPLICATION IS DESCRIBED OF THE CAST-IN-SITU WALL TECHNIQUE TO (1) THE BUILDING OF THE BUTTRESSES OF THE CONCORDE BRIDGE AND WIDENING OF THE LATTER BY MEANS OF SEVEN ONE-METER THICK REINFORCED CONCRETE WALLS REACHING DOWN TO THE LEVEL OF THE FRESH WATER LIMESTONE IN WHICH THEY WERE ANCHORED BY MEANS OF PRESTRESSED RODS, AND (2) THE CONSTRUCTION OF THE WATER STORAGE CHAMBER OF THE BERCY INTERCHANGE. /LCPC/RRL/