PRT-suburban depressed grade

The report examined the implications of constructing lengths of PRT guideway in open trenches in response to the severe problem of elevated guideway intrusion in residential and scenic areas. The report concludes that the solution is a physically feasible and economically practical - particularly in selected areas. The cost is equivalent to a cut and cover tunnel solution which may be preferable.

Language

  • English

Media Info

  • Pagination: 15P

Subject/Index Terms

Filing Info

  • Accession Number: 01440204
  • Record Type: Publication
  • Source Agency: ARRB
  • Files: ATRI
  • Created Date: Aug 24 2012 10:53PM