CATENARY SYSTEM AND POWER SUPPLY FACILITIES OF THE MUSKINGUM ELECTRIC RAILROAD
The substation and catenary facilities described were developed to provide ideas, examples, and cost samples to show what can be done in electrifying main-line railroad freight service. Catenary for the project is the first 25-kv 60-Hz system installed in the United States. Three types of catenary hangers were used to provide a measure of comparison of different ideas. Installation procedures are described in detail.
-
Corporate Authors:
Institute of Electrical and Electronics Engineers (IEEE)
3 Park Avenue, 17th Floor
New York, NY United States 10016-5997 -
Authors:
- Oliver, T A
- Ross, B A
- Cowal, A R
- Thompson, J S
- Publication Date: 1971-9
Media Info
- Pagination: p. 658-665
-
Serial:
- IEEE Transactions on Industry and General Applications
- Volume: 1GA7
- Issue Number: 5
- Publisher: Institute of Electrical and Electronics Engineers (IEEE)
Subject/Index Terms
- TRT Terms: Catenaries (Railroads); Electric power supply; Electric substations; Railroad electrification
- Old TRIS Terms: Muskingum electric railroad
- Subject Areas: Energy; Railroads;
Filing Info
- Accession Number: 00043007
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Apr 2 1973 12:00AM