Modification of asphalt pavement and surfacing design to suit site constraints

A full-depth asphalt pavement was proposed for Albion Street in Warwick to rehabilitate a section of the National Highway. Heavy traffic conditions necessitated a strong pavement. However, constraints imposed by the proximity of heritage buildings and the location of vital services required a different approach to construction. This paper describes the changes made to the design and construction techniques to successfully complete the project.

Language

  • English

Media Info

  • Pagination: 257-61

Subject/Index Terms

Filing Info

  • Accession Number: 01435713
  • Record Type: Publication
  • Source Agency: ARRB
  • Files: ATRI
  • Created Date: Aug 24 2012 7:11PM