CONSTRUCTION OF THE ELANSKER BOG EMBANKMENT WHICH FORMS PART OF THE TJUMEN-SURGUT RAILWAY /IN RUSSIAN/

THE CROSSING OF 6 KM OF THE ELANSKER BOG WAS-CARRIED OUT IN WINTER 1966/67, AND TOOK 4 MONTHS. EXCAVATION OF THE PEAT BY DRAGLINE EXCAVATORS, FILLING OF THE FOOT OF THE EMBANKMENT, PUMPING OT OF WATER AND COMPACTION ARE DESCRIBED. THE EMBANKMENT WAS RE-COMPACTED AFTER THE THAW PERIOD, AND PROCTOR DENSITIES OF 0.93-0.95 WERE OBTAINED. THE EQUIPMENT USED IS DESCRIBED IN DETAIL. /FG/RRL/