CALICHE-CEMENT STABILIZATION

CONSTRUCTION IS REPORTED ON A PROJECT WHICH CONSISTED OF REMOVING THE ASPHALT TOP FROM A CALICHE BASE, STABILIZING THE CALICHE FOR A DEPTH OF 6 IN. WITH 8% CEMENT BY VOLUME, AND SURFACING IT WITH APPROXIMATELY 3/4 IN. OF CUT-BACK ASPHALT CONCRETE FOR A WIDTH OF 20 FEET.

  • Supplemental Notes:
    • No 83, pp 5-22
  • Corporate Authors:

    Texas State Department of Highways & Public Transp

    /Information Exchange
    ,   United States 
  • Publication Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 00231668
  • Record Type: Publication
  • Source Agency: Highway Research Board Bibliography
  • Files: TRIS, STATEDOT
  • Created Date: Feb 16 1970 12:00AM