ON THE EXECUTION OF SOIL-CEMENT BASE CONSTRUCTION IN OSAKA CITY

THE PLATE BEARING VALUE, K, WAS MEASURED AFTER ONE AND SEVEN DAYS. THE CEMENT CONTENTS OF SAMPLES FROM THE TOP, MIDDLE, AND BOTTOM LAYERS WERE MEASURED AFTER EACH PASS OF THE MIXER AND VARIATIONS ARE SHOWN OF CEMENT CONTENT AFTER EACH PASS OF THE ROTARY MIXER. CEMENT CONTENTS IN THE SOIL- CEMENT SAMPLES WERE MEASURED USING THE SPECIFIC GRAVITY OF THE SOIL-CEMENT SOLUTIONS RATHER THAN THE MORE DIFFICULT ASTM METHOD. THREE PASSES OF THE ROTARY MIXER WERE REQUIRED TO PRODUCE UNIFORM MIXTURES.