DESIGN SECTION C006: HUNTINGTON ROUTE. SUBSURFACE INVESTIGATION, PENTAGON STATION

RESULTS OF SEVEN BORINGS PERFORMED AT THE LOCATION OF THE PLANNED PENTAGON STATION AND FOR THE ENTRANCE STRUCTURE CONNECTING THE STATION WITH PENTAGON BUILDING IN SECTION C006 OF HUNTINGTON ROUTE ARE SUMMARIZED IN THE REPORT. IT CONTAINS GEOLOGICAL SECTIONS THROUGH THE BORINGS, LOGS OF THE BORINGS, RESULTS OF TESTS PERFORMED ON UNDISTURBED SOIL SAMPLES AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/

  • Supplemental Notes:
    • Rept No MRWJ-71-49
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1971-3-31

Media Info

  • Pagination: 37 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230307
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Files: TRIS
  • Created Date: Dec 11 1973 12:00AM