SUBSURFACE INVESTIGATION, PORTIONS OF CONNECTICUT AVENUE ROUTE BETWEEN LAFAYETTE PARK AND COLUMBIA ROAD

RESULTS OF 16 TEST BORINGS PERFORMED ON THE PROPOSED SUBWAY LINE OF THE WASHINGTON METROPOLITAN AREA METRO SYSTEM IN PHASE II BETWEEN LAFAYETTE PARK AND COLUMBIA ROAD ARE SUMMARIZED IN THIS PRELIMINARY REPORT. IT CONTAINS A SERIES OF GEOLOGICAL SECTIONS ALONG THE SUBWAY, LOGS OF THE BORINGS, ENGINEERING LABORATORY TEST RESULTS AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/

  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1966-9-8

Media Info

  • Pagination: 161 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230282
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-66-2
  • Files: TRIS
  • Created Date: Dec 4 1973 12:00AM