DESIGN SECTION F003: BRANCH ROUTE. SUBSURFACE INVESTIGATION, BUILDING 213, WASHINGTON NAVY YARD

RESULTS OF SIX BORINGS PERFORMED NEAR BUILDING 213 OF WASHINGTON NAVY YARD ADJACENT TO BRANCH ROUTE ARE SUMMARIZED IN THE REPORT. THE PURPOSE OF THE INVESTIGATION WAS TO DETERMINE THE DETAILED SUBSOIL CONDITIONS IN ORDER TO EVALUATE THE EFFECT OF SUBWAY CONSTRUCTION ON THE EXISTING BUILDING. THE REPORT CONTAINS GEOLOGICAL SECTIONS THROUGH THE BORINGS, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTS ON UNDISTURBED SOIL SAMPLES AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/

  • Supplemental Notes:
    • MRWJ-71-50
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1971-4-20

Media Info

  • Pagination: 35 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230269
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Files: TRIS
  • Created Date: Dec 4 1973 12:00AM