Moree town centre bypass : Gwydir Highway connection : modification to the approved project : environmental assessment

The approved Moree town centre bypass realigns the existing Newell Highway around the eastern side of the town centre via a new 4.4 kilometre length of two lane road and a new bridge over the Mehi River. The proposed modification involves using the Gwydir Highway (Alice Street) to facilitate a staged opening in advance of the Moree bypass project. It will allow the bypass north of Alice Street to open in advance of the bypass south of Alice Street. The modification to the approved project is referred to as the Gwydir Highway connection. This report describes the modifications, assesses the environmental issues associated with the construction and operation of the Gwydir Highway connection (GHC) and identifies specific mitigation measures over and above those already required by current conditions of approval.

  • Corporate Authors:

    New South Wales. Roads and Traffic Authority

    ,    
  • Publication Date: 2009

Subject/Index Terms

Filing Info

  • Accession Number: 01382802
  • Record Type: Publication
  • Source Agency: ARRB
  • Files: ATRI
  • Created Date: Aug 22 2012 1:32PM