BAY AREA FREEWAY OPERATIONS STUDY - EIGHTH INTERIM REPORT

THIS REPORT, THE EIGHTH IN A SERIES, CONTAINS A REVIEW OF THE DATA COLLECTION TECHNIQUES AND ANALYSIS METHODS USED FOR THE BAY AREA FREEWAY OPERATIONS STUDY. THE REPORT DESCRIBES THE PRELIMINARY WORK WHICH PRECEEDED THE SELECTION OF THE DATA COLLECTION TECHNIQUES. IT CONTAINS A SUMMARY OF THE MAN-HOURS EXPENDED AND COST FOR DIFFERENT PHASES OF THE DATA COLLECTION AND REDUCTION. RECOMMENDATIONS FOR FUTURE STUDIES BASED ON THE EXPERIENCE GAINED DURING THIS STUDY ARE PRESENTED. /BPR/

  • Supplemental Notes:
    • Hpr, C-1-10
  • Corporate Authors:

    University of California, Berkeley

    Institute of Transportation and Traffic Engineering
    Berkeley, CA  United States 

    California Division of Highways

    Bridge Department
    Sacramento, CA  United States  05914

    Bureau of Public Roads /US

    400 7th Street, SW
    Washington, DC  United States  20590
  • Authors:
    • Gillfillan, W E
  • Publication Date: 1969-3

Subject/Index Terms

Filing Info

  • Accession Number: 00224916
  • Record Type: Publication
  • Source Agency: Bureau of Public Roads /US
  • Files: TRIS
  • Created Date: Oct 7 1994 12:00AM