REDUCING MOTORIST INCONVENIENCE DUE TO MAINTENANCE OPERATIONS ON HIGH-VOLUME FREEWAYS

MUDJACKING OPERATIONS ALONG THE SAN DIEGO FREEWAY REQUIRED THAT CONCRETE SLABS BE PLACED IN TWO-LANE SECTIONS. THE SCHEDULING AND TRAFFIC-CONTROL PRACTICES EMPLOYED TO MINIMIZE DELAY DURING THIS THREE-MONTH TASK ARE DESCRIBED.

  • Record URL:
  • Availability:
  • Supplemental Notes:
    • Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved
  • Authors:
    • Forbes, C E
    • Smith, J H
    • SCHAEFER, W E
  • Conference:
  • Publication Date: 1971

Media Info

  • Media Type: Print
  • Features: Figures; References;
  • Pagination: pp 181-188
  • Monograph Title: Improving Pavement and Bridge Deck Performance
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00225963
  • Record Type: Publication
  • ISBN: 0309018439
  • Files: TRIS, TRB, ATRI
  • Created Date: Jun 29 1971 12:00AM