PERMANENT WAY TESTS AND PRACTICE ON THE L.M.S.R.--II
Joints in tunnel track, experience with continuous welded rail, use of short fishplates, experience with Douglas fir cross ties, and tests using flat-bottom rail are described. These early tests with welded rail indicated that reduced maintenance costs could not offset the added initial costs.
-
Corporate Authors:
Temple Press Limited
161-166 Fleet Street
Longon EC4, England -
Authors:
- Wallace, W K
- Publication Date: 1942-11-20
Media Info
- Features: Tables;
- Pagination: p. 489-490
-
Serial:
- RAILWAY GAZETTE
- Volume: 77
Subject/Index Terms
- TRT Terms: Costs; Fastenings; Maintenance management; Maintenance of way; Rail (Railroads); Railroad ties; Railroad tracks; Structural design; Technology; Tie bars; Tunnels; Welded rail; Wood ties
- Uncontrolled Terms: Maintenance costs; Track design
- Geographic Terms: United Kingdom
- Old TRIS Terms: Wooden cross ties
- Subject Areas: Bridges and other structures; Finance; Railroads;
Filing Info
- Accession Number: 00039529
- Record Type: Publication
- Files: TRIS
- Created Date: Dec 4 1994 12:00AM