EVALUATION OF A REMOVAL OF CURB PARKING AND CONVERSION TO FIVE LANE STREET OPERATION

A SERIES OF PARKING REMOVAL STUDIES ARE BEING CONDUCTED ON MICHIGAN TRUNKLINES BY THE TRAFFIC & SAFETY DIVISION OF THE MICHIGAN DEPARTMENT OF STATE HIGHWAYS. IT INVOLVES AN EVALUATION OF PARKING REMOVAL ON 3.25 MILES OF M-153 (FORD ROAD) WITHIN THE CORPORATE LIMITS OF GARDEN CITY WHICH HAS A POPULATION OF 40,000. IN CONJUNCTION WITH THE PARKING REMOVAL, THE NUMBER OF LANES WAS INCREASED FROM FOUR TO FIVE PROVIDING A CENTER LANE FOR LEFT TURNS. THE LOCATION HAD AN ACCIDENT REDUCTION OF 24% (659 TO 501) IN THE TWO YEAR PERIOD AFTER THE IMPROVEMENT. THE COST OF THE PROJECT WAS $5,347 AND THE COST BENEFIT DURING THE TWO YEARS AFTER THE IMPROVEMENT WAS $153,300. /AUTHOR/

  • Supplemental Notes:
    • 12 Pp, 4 FiG, 2 APP, 4 TAB
  • Corporate Authors:

    Michigan Department of State Highways

    State Highways Building, PO Drawer K
    Lansing, MI  United States  48904
  • Authors:
    • Hoffman, M R
    • Lampela, A A
    • Alashari, N
  • Publication Date: 1968-11

Subject/Index Terms

Filing Info

  • Accession Number: 00220732
  • Record Type: Publication
  • Files: TRIS, STATEDOT
  • Created Date: Apr 13 1970 12:00AM