A METHOD FOR DETERMINING BRIDGE PAINTING CYCLES
FACTORS INFLUENCING EFFECTIVENESS, COST, AND TIME CYCLES FOR BRIDGE PAINTING ARE DISCUSSED. STRUCTURAL, ENVIRONMENTAL , AND CHEMICAL FACTORS OF THE PAINT SYSTEM ARE CONSIDERED IN THE MATHEMATICAL MODEL DESCRIBED. HOW MATHEMATICAL EVALUATION CAN AFFECT THE DECISION OF OPTIMUM PAINTING CYCLE TIMES IS SHOWN. THE PROCEDURE HAS BEEN USED BY PORT OF NEW YORK AUTHORITY, TUNNELS AND BRIDGES DEPARTMENT, TO EVALUATE PAINTING CYCLES FOR NEW YORK BRIDGES.
-
Supplemental Notes:
- Vol 4, No 6, PP 40-49
-
Authors:
- Kirsch, C M
- Publication Date: 1965-6
Media Info
-
Serial:
- Materials Protection
- Publisher: National Association of Corrosion Engineers
Subject/Index Terms
- TRT Terms: Bridges; Chemical properties; Costs; Decision making; Economic efficiency; Environmental impacts; Mathematical models; Optimization; Painting; Structural analysis; Structural mechanics; Time
- Uncontrolled Terms: Efficiency; Structural behavior
- Geographic Terms: New York (State)
- Old TRIS Terms: Cycles; Time factor
- Subject Areas: Bridges and other structures; Economics; Environment; Finance; Geotechnology; Highways; Maintenance and Preservation; Materials;
Filing Info
- Accession Number: 00218153
- Record Type: Publication
- Files: TRIS
- Created Date: Feb 20 1994 12:00AM