NONSKID DECK

A ROUGHING-UP JOB WAS DONE ON THE OPEN STEEL GRID DECK OF THE MAXWELL BRIDGE OVER THE NAPA RIVER. THIS 132-FT, TWO- LANE LIFT SPAN PRESENTED A SKID PROBLEM IN DAMP WEATHER. OVER 18,000 STUDS WERE WELDED TO THE DECK, LEAVING A HOBNAIL EFFECT. THE DECK CONSISTS OF LONGITUDINAL BARS ON EDGE 2-1/2 IN. APART WITH ZIGZAG BARS FOR SPACERS. AFTER TRAFFIC VOLUME INCREASED AND SKIDDING ACCIDENTS OCCURRED, THE DECK WAS TREATED WITH AN EPOXY ADHESIVE COVERED WITH ALUMINUM OXIDE GRITS. THIS $2500 PROCESS WAS REPEATED 18 MONTHS LATER AT A COST OF $2000. CONTINUED INCREASE IN TRAFFIC WOULD NECESSITATE YEARLY TREATMENT. STUDS WERE WELDED AT THE BAR INTERSECTIONS OF THE GRID DECK RESULTING IN A LONGITUDINAL AND TRANSVERSE PATTERN 5 IN. APART. INTERMEDIATE LONGITUDINAL BARS WERE SPOTTED WITH STUDS AT 15-IN. CENTERS TO BREAK UP ANY SWAY PATTERN. ALTHOUGH STATE MAINTENANCE CREWS WERE UNFAMILIAR WITH STUD GUN OPERATION, THEY WERE SOON PLACING STUDS AT THE RATE OF 4 TO 6 PER MINUTE PER MAN. THE JOB WAS COMPLETED IN 3-1/2 DAYS INSTEAD OF THE ESTIMATED 6 DAYS. THE PREVIOUS TREATMENTS OF EPOXY AND ABRASIVES HAD TAKEN OVER A WEEK EACH TIME. SINCE A NUMBER OF STATE BRIDGES HAVE OPEN GRID DECKS, THE EFFECTIVENESS OF THIS TREATMENT MAY PROMPT ITS USE AT OTHER LOCATIONS.

  • Supplemental Notes:
    • Vol 44, No 5/6, PP 48-49
  • Authors:
    • Carter, C P
  • Publication Date: 1965-5

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00218150
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Feb 20 1994 12:00AM