CLOSURE RING BOLTS IN DYNAMICALLY LOADED STRUCTURES

SCHLIESSRINGBOLZEN BEI DYNAMISCH BEANSPRUCHTEN KONSTRUKTIONEN (SRB-VERBINDUNGEN)

SUGGESTIONS CAN BE MADE ACCORDING TO THE TEST RESULTS: FOR PERMISSIBLE TRANSMITTABLE FORCES AT N (PERPENDICULAR TO THE BOLT AXIS): FOR THE DETECTION OF COMPONENTS IN DYNAMICALLY STRESSED STEEL STRUCTURES WITH REFERENCE TO THE DAST GUIDE LINE 001, FROM A LOGICAL INTERPRETATION OF THE APPROPRIATE SPECIFICATIONS FOR HV JOINTS (DAST GUIDELINE 010). THE ADVANTAGES OF SRB JOINTS FOR ESSENTIALLY STATIC LOADING CAN ALSO BE TAKEN FOR DYNAMICALLY STRESSED JOINTS. SINCE NO TORSIONAL STRESSES CAN BE TRANSMITTED TO THE SHANK USING THE HUCK BOLT THE TOTAL STRAIN IS ATTRIBUTED ENTIRELY TO THE INITIAL STRESSING FORCE. EYEBOLTS CAN GENERALLY BE PUT IN MORE RAPIDLY THAN RIVETS OR HV BOLTS. IT MAY THEN BE MORE ECONOMIC IF LARGER QUANTITIES CAN BE PUT IN, WORKING FROM ONE POSITION.

    Language

    • German

    Project

    • Status: Completed
    • Contract Numbers:

      ITRD 4.2.08/II

    • Sponsor Organizations:

      FIRMA TITGEMEYER, GESELLSCHAFT FUER BEFESTIGUNGSTECHNIK

      SEMINARSTR. 33-34, POSTFACH 4309
      OSNABRUECK,   Germany  D-4500

      DEUTSCHER AUSSCHUSS FUER STAHLBAU (GERMAN STEEL WORKS COMMITTEE)

      EBERTPLATZ 1
      KOELN,   Deutschland  D-5000
    • Project Managers:

      VALTINAT, G

      STEINHARDT, O

    • Performing Organizations:

      KARLSRUHE UNIV. (TH), VERSUCHSANSTALT FUER STAHL, HOLZ UND STEINE (KARLSRUHE TECHNICAL UNIV., TESTING INST. FOR STEEL, WOOD AND STONES)

      KAISERSTR. 12
      KARLSRUHE,   Germany  D-7500
    • Start Date: 19720000
    • Expected Completion Date: 0
    • Actual Completion Date: 19721200
    • Source Data: ITRD D701204

    Subject/Index Terms

    Filing Info

    • Accession Number: 01304416
    • Record Type: Research project
    • Source Agency: Bundesanstalt für Straßenwesen (BASt)
    • Contract Numbers: ITRD 4.2.08/II
    • Files: ITRD
    • Created Date: Nov 21 2010 9:55AM