LONG TERM OBSERVATIONS AT SELECTED ROAD SECTIONS. PART 2

LANGZEITBEOBACHTUNGEN AN AUSGEWAEHLTEN STRASSENABSCHNITTEN, 2. TEIL

THE AIM OF THE RESEARCH IS TO EXAMINE ROADS IN RELATION TO TRAFFIC AND OTHER IMPORTANT INFLUENCES AND TO WORK OUT RELATIONS BY MEANS OF EVALUATIONS. THE DESIRED DATA ARE TO BE OBTAINED BY NUMEROUS MEASUREMENTS. FOR SOME YEARS TRAFFICABILITY HAS BEEN USED IN THE MAIN FOR DESCRIBING THE BEHAVIOUR OF ROADS. ALL OF THE DATA CAN THEREFORE BE RELATED TO THIS. OBSERVATION OF THE TRANSVERSE PROFILE IS NECESSARY FOR EVALUATING GEOMETRIC DEFORMATIONS OF THE ROAD STRUCTURE. ELASTIC CONSTANTS ARE TO BE DETERMINED ON SOME ROAD SECTIONS FOR LATER COMPARISON WITH THEORETICAL OBSERVATIONS.

    Language

    • German

    Project

    • Status: Active
    • Contract Numbers:

      ITRD 04.016R74C

    • Sponsor Organizations:

      BUNDESMINISTER FUER VERKEHR

      KENNEDYALLEE 72
      BONN-BAD GODESBERG 1,   Germany  D-5300
    • Project Managers:

      -, 

    • Performing Organizations:

      AMTL. FORSCHUNGS- U. MATERIALPRUEFUNGSANSTALT F.D. BAUWESEN, OTTO-GRAF-INSTITUT AN DER UNIVERSITAET STUTTGART, ABT. BAUPHYSIK (UNIVERSITY OF STUTTGART, OFFICIAL RESEARCH AND MATERIALS TESTING INSTITUTE FOR CONSTRUCTION (OTTO-GRAF INSTITUTE)

      PFAFFENWALDRING 4
      STUTTGART 60,   Germany  D-7000
    • Start Date: 19740800
    • Expected Completion Date: 0
    • Actual Completion Date: 0
    • Source Data: ITRD D701463

    Subject/Index Terms

    Filing Info

    • Accession Number: 01302681
    • Record Type: Research project
    • Source Agency: Forschungsgesellschaft für Straßen- und Verkehrswesen (FGSV)
    • Contract Numbers: ITRD 04.016R74C
    • Files: ITRD
    • Created Date: Nov 21 2010 8:46AM