TIME DEPENDENT STUDIES OF ROAD CONSTRUCTION

ZEITRAFFENDE UNTERSUCHUNG VON STRASSENKONSTRUKTIONEN

THE TIME DEPENDENT STUDY OF ROAD CONSTRUCTIONS IN A CIRCULAR TEST TRACK IS DESCRIBED AS AN IMPORTANT COMPONENT IN THE SOLUTION OF ROAD CONSTRUCTION PROBLEMS AND IS ILLUSTRATED WITH SOME CHARACTERISTIC EXAMPLES. IT IS SUGGESTED IN AUSTRIA THAT THE NUMEROUS POSSIBILITIES OF USING EXISTING CIRCULAR TRACKS IN EUROPE SHOULD BE ADOPTED RATHER THAN CONSTRUCTING ONE IN AUSTRIA AT HIGH EXPENSE. FURTHERMORE, THE IMPORTANCE OF LONG TERM OBSERVATION OF ROAD SECTIONS FOR ROAD RESEARCH IS EMPHASISED.

Language

  • German

Media Info

  • Pagination: 341-6
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 01302025
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Files: ITRD
  • Created Date: Nov 21 2010 8:29AM