TUNNELLING WORK. SPECIFICATIONS AND THE DRAWING UP OF CONTRACTS

UNTERTAGEBAUARBEITEN. RICHTLINIEN UND VERTRAGSBESTIMMUNGEN.

THIS SPECIFICATION IS TO BE USED FOR THE CONSTRUCTION AND SUPPORT OF UNDERGROUND CAVITIES, WHERE THESE ARE CONSTRUCTED BY TUNNELLING METHODS AND NOT IN OPEN CUT. TUNNELLING WORK IN MINING IS NOT COVERED IN THIS SPECIFICATION. THIS DOCUMENT CONTAINS IN SECTION 1, WHICH IS NOT TO BE TAKEN AS A DEFINITIVE PART OF A TENDER DOCUMENT, DEFINITIONS, ADVICE ON THE PREPARATION OF BILLS OF QUANTITIES AND TENDER DOCUMENTS. SECTION 2 CONTAINS CONTRACT DOCUMENTS FOR ROCK CLASSIFICATION, MEASUREMENT, EXCAVATION AND TUNNEL DRIVING, SUPPORT MEASURES, LINING WORK AND INTERNAL FINISHING WORK, AS WELL AS OTHER ASSOCIATED WORKS SUCH AS THE TAKING OFF OF QUANTITIES.

  • Corporate Authors:

    FACHNORMENAUSSCHUSS "VERDINGUNGSWESEN"

    ,    
  • Publication Date: 1975-2-1

Language

  • German

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01301957
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Files: ITRD
  • Created Date: Nov 21 2010 8:27AM