DECISION AND OPTIMISATION MODELS FOR THE PRACTICE OF TRAFFIC PLANNING. PART A: OPTIMISATION PROCEDURE

ENTSCHEIDUNGS- UND OPTIMIERUNGSMODELLE FUER DIE PRAXIS DER VERKEHRSPLANUNG, TEIL A: OPTIMIERUNGSVERFAHREN

PROCEDURES DEVELOPED IN THE FIELD OF OPERATIONS RESEARCH ARE TO BE ADAPTED TO THE REQUIREMENTS OF ROAD AND TRAFFIC PLANNING. FOR THIS A GENERALLY VALID DEFINITION OF CONCEPTS HAS TO BE WORKED OUT. AN ANALYSIS OF THE DEMAND FOR APPLICABLE PROCEDURES IS TO BE CARRIED OUT, AND BASED ON THIS A SIMPLE PROCEDURE IS TO BE DERIVED, TAKING ACCOUNT OF REQUIREMENTS AND BOUNDARIES OF USE. A COMPARISON OF DEVELOPED AND DEVELOPING MODELS SHOULD LEAD TO AN ILLUSTRATION OF DIFFICULTIES INVOLVED IN DEVELOPMENT AND APPLICATION. PROPOSALS ARE TO BE WORKED OUT FOR THE PREPARATION AND DEVELOPMENT OF THE AVAILABLE PROCEDURES.

    Language

    • German

    Project

    • Status: Active
    • Contract Numbers:

      ITRD 1.058G79H

      ITRD 1.058G79H

    • Sponsor Organizations:

      BUNDESMINISTER FUER VERKEHR (FEDERAL MINISTER OF TRANSPORT)

      POSTFACH 20 01 00
      BONN 2,   DEUTSCHLAND BR  D-5300
    • Project Managers:

      BOESEFELDT, J

      HEUSCH, H

    • Performing Organizations:

      BERATENDE INGENIEURE DR.-ING. H. HEUSCH - DIPL.-ING. J. BOESEFELDT (CONSULTING ENGINEERS DR.-ING. H. HEUSCH - DIPL.-ING. J BOESEFELDT)

      PETERSTR. 2-4
      AACHEN,   DEUTSCHLAND BR  D-5100
    • Start Date: 19790400
    • Expected Completion Date: 19801000
    • Actual Completion Date: 0
    • Source Data: ITRD D702061

    Subject/Index Terms

    Filing Info

    • Accession Number: 01295877
    • Record Type: Research project
    • Source Agency: Forschungsgesellschaft für Straßen- und Verkehrswesen (FGSV)
    • Contract Numbers: ITRD 1.058G79H, ITRD 1.058G79H
    • Files: ITRD
    • Created Date: Nov 21 2010 5:14AM